Development 1988 results

DEVELOPMENT: New, bigger proposal for 35th/Holden/Ida

(Google Maps’ Street View image of site)

Two years after a development proposal at 7617 35th SW stalled in Design Review, with the property put back up for sale, a new, bigger proposal has just appeared in city files. This time, the proposed redevelopment site spans 35th frontage from Ida to Holden – 3507 SW Ida, 7603 and 7617 35th SW, per the early-stage site plan. That includes the former Howden-Kennedy Funeral Home building as well as the Complete Auto Repair site. The proposal is for a five-story apartment building with underground parking, which would have an entry off SW Holden; the city website shows 124 apartments are proposed, with 60 vehicle-parking spaces and 140 bicycle-parking spaces. The city site also lists LDG Architects as working on the project; they were also architects of record for the previous proposal, which had envisioned up to 50 apartments. Property records show the owner of the Complete Auto Repair site bought the other two parcels last October for $1.4 million total. Since this is an early-stage proposal, it’s not at the public-comment stage yet, but we’ll be watching for that. (Thanks to John for the tip.)

DEVELOPMENT: Design Review Board going online, with 2 Triangle sites scheduled for August meetings

(Project-sites map as shown during February community meeting)

The last time the Southwest Design Review Board met was March 5th, just before in-person community meetings came to a halt because of the pandemic. Four months later, the city is working on getting the all-volunteer boards set up for online meetings, and two neighboring projects in the West Seattle Triangle are tentatively set for reviews in August: 4406 36th SW on August 6th – summarized as “a 7-story, 277-unit apartment building with retail. Parking for 188 vehicles proposed” and 4440 Fauntleroy Way SW on August 20th, summarized as “a 7-story, 209-unit apartment building with retail. Parking for 136 vehicles proposed.” Seeing those dates and knowing the board hasn’t been meeting, we checked with the Department of Construction and Inspections, whose spokesperson Wendy Shark told us:

We are hoping to launch the pilot of virtual Design Review Board meetings in August. At this time, these projects are intended to be conducted with the Board via an online platform. Details regarding the remote meetings will be forthcoming on the Design Review website.

You might also be wondering about big projects proceeding despite the bridge’s closure and uncertain future. These are part of the Sweeney family’s holdings centered on the current site of their longtime business Alki Lumber; we asked family spokesperson Lynn Sweeney, who replied, “We are moving forward with Design Review. I know there is a lot of uncertainty right now but we remain hopeful that our project will ultimately be well-timed.” We last spoke with her back in January, when these two sites were first entered into the city process; that was a year after the family announced they were “studying alternatives.” Our past coverage also includes February’s early community outreach meeting with the development team.

DEVELOPMENT: Long-stalled redevelopment site up for sale

Thanks for the tips! The long-stalled development site adjacent to Ephesus, with the same property owner, is up for sale. Listing price: $1.7 million, including the plans for the three-story mixed-use building that was in progress, and the foundation and underground garage that have already been poured. The site held a small commercial building – before demolition in 2012; its businesses included a quirky retail shop called Cavvy’s, and Rick’s Barber Shop (which in the ensuing years has had to move again because of redevelopment). Work started in 2016, but didn’t get beyond the concrete and a bit of framing. Our archives show the site described with addresses including 5247 and 5251 California; the previous permits were granted for 5247, but the real-estate listing identifies the site as 5249.

DEVELOPMENT: Feedback sought for 4515 44th SW apartment proposal

(King County Assessor’s Office photo)

Three months ago, we reported on an early-stage proposal for the former CDE Software site at 4515 44th SW [map] in The Junction. Now, West Seattle-headquartered developer Blueprint Capital is in the “early community outreach” process for the project. Blueprint’s Jade Aramaki sent the announcement:

The new development will include a new five-story apartment building containing small efficiency dwelling units and 1 bedrooms, no parking proposed.

I’m reaching out because I want to hear from you, the community, about this project. You can engage with this process a couple of ways. First, you can fill out the survey located here. The comment period will be open until July 20th. Second, you can email me directly (jade@blueprintcap.com) with any questions you may have; I’d be happy to have a dialogue with you. Third, if you live in close proximity you will receive a postcard with ways to engage. I have attached a digital copy of this information, feel free to post this on blogs, print out on bulletins, etc. Note that any information you share could be made public, so please refrain from sharing personal or sensitive information.

Due to the nature of our current environment with the stay-home order in place there will be no in-person outreach or public meeting. Therefore your input is even more important and appreciated.

A document in the project’s online file says 37 units are planned. According to Blueprint’s flyer, construction is still at least two years away.

DEVELOPMENT: Land-use approval for 32 townhouses on Harbor Avenue

(Rendering by Steve Fischer Architects)

Land-use approval has been granted for 32 townhouses planned along Harbor Avenue SW. Rather than one project, the townhouses – though next to each other – are in the system as four separate projects: Seven units at 3252 30th SW, nine units at 3315 Harbor SW, eight units at 3303 Harbor SW, and eight units at 3257 Harbor SW. The approval notices – linked to each of those individual addresses – open a two-week period in which appeals can be filed, deadline July 13th. The townhouses passed Design Review last September; here’s our report on the final meeting.

DEVELOPMENT: Land-use approval for 5 ‘cottages’ in South Delridge

(Google Maps Street View photo of site, August 2019)

A unique redevelopment project in South Delridge has just gotten land-use approval. Earlier this year, we briefly mentioned the five “cottages” proposed to replace an old house at 9224 20th SW (map). The project documents show the site owner told the city he planned to rent the small 2-story houses rather than sell them, and that two would be “affordable” to satisfy the HALA-Mandatory Housing Affordability requirements of the site. Otherwise, documents say, the property owner would expect to pay a fee of almost $30,000 in lieu of having affordable units. Five offstreet-parking spaces are planned. The city approval document is here; the notice explaining how to appeal is here.

UPDATE: Tower crane goes up at 1250 Alki SW

(Photo sent by Matt Ohlinger)

11:58 AM: As previewed last night, the tower crane for 1250 Alki SW is going up right now, which means traffic is down to one lane (alternating) until it’s done.

(Photo sent by Stewart L.)

The project team estimates it’ll take until 4 pm or so.

(Photo sent by Lynn Hall)

The project, Infinity Shore Club Residences, is planned for 40 condominiums on a site that previously held five houses and had an earlier proposal – five years ago – for 125 apartments.

(Photo sent by Stewart L.)

7:41 PM: By just after 6, the installation appeared mostly done:

(Photo sent by Lynn Hall)(WSB photo)

With this, there are currently two tower cranes in West Seattle; the other is at the 4722 Fauntleroy Way SW two-building mixed-use project.

TRAFFIC ALERT: Crane installation at 1250 Alki on Thursday

Just got word of a traffic alert for tomorrow: The Infinity Shore Club Residences construction site at 1250 Alki SW will get its crane installed, which means, according to the project team:

Alki Ave will be reduced to a single lane of alternating traffic from 5:00 AM to approximately 4:00 PM.

Police will be providing traffic control throughout the day.

That’ll be West Seattle’s second crane; the other is at the two-building 4722 Fauntleroy Way SW project.

DEVELOPMENT: Comment time for 3417 Harbor SW apartments

(WSB file photo, 3417 Harbor SW project site)

The next phase of public comment is beginning for the last project seen by the Southwest Design Review Board before in-person meetings were suspended in March (WSB coverage here). It’s 3417 Harbor SW (map), currently described as a “5-story, 115-unit apartment building (with offstreet parking) for 68 vehicles,” on a site that currently holds a house that’s been serving as a commercial office. The project’s land-use application has been formally submitted, so that opens a 2-week comment period (through June 8th); the notice explains how to comment. The project also still has to go through the second phase of Design Review – no timeline for that yet; we’ve been tracking the proposal for more than a year.

DEVELOPMENT: Another Alki project gets started

Thanks to Stewart L. for the photo and tip. It was demolition time today for the houses at 1778 and 1780 Alki Avenue SW [map], 82 and 110 years old, respectively. They’re making way for a 3-story, 6-townhouse project with 9 offstreet-parking spaces. It’s been in the works since August 2018; the site changed hands this past February, for $2.3 million.

FOLLOWUP: Key approval for Transitional Resources Yancy Street project

(Rendering by SMR Architects)

That’s the final rendering for Yancy Street, the supportive-housing complex that West Seattle nonprofit Transitional Resources plans to build on the project’s namesake street, with 44 studio apartments for people living with behavioral-health challenges. It just got key city approvals, as announced in Monday’s Land Use Information Bulletin. We first reported on the project in February 2018; it’s replacing houses at 2811, 2821, and 2827 SW Yancy that TR has long used as shared housing. (Our past coverage also includes a design-feedback open house last year, plus news of partial city funding.) You can read the full decision here; its publication opens a 2-week appeal period, explained here. TR CEO Darcell Slovek-Walker tells WSB, “We anticipate that demolition/construction will start end of June/early July.” Her nonprofit, headquartered nearby, already provides housing for more than 80 people.

DEVELOPMENT: 8 units proposed for 9238 20th SW

(King County Assessor’s Office photo)

More south West Seattle redevelopment: That 99-year-old house at 9238 20th SW [map] is proposed to be replaced by an 8-unit rowhouse/townhouse project, with 8 offstreet-parking spaces. Nearby resident Colleen tipped us after an Early Design Review Community Outreach flyer arrived via mail. It points to this website, which includes the design packet by John Trieger Architects, as well as a survey.

DEVELOPMENT: 1116 Alki Avenue SW project proposes 50 to 65 residential units

(Image courtesy Google Maps/Street View)

A new early-stage redevelopment proposal for Alki will replace the last pocket of beach bungalows at the tip of Duwamish Head with one building containing 50 to 65 units. The project address is 1116 Alki SW [map]; the site also includes five lots to the west, according to the site plan filed last week. Another document in the online file says the building would be six stories with one partly underground level of parking, which would include 77 to 103 spaces (as per the Alki Parking Overlay, which requires 1 1/2 spaces per unit). Property records show the three westernmost parcels were sold together in 2014 for $3.6 million; the three easternmost parcels were sold in 2017 transactions that totaled more than $4.5 million. Four of the six houses to be demolished are more than a century old. This is an early-stage proposal, so no public-comment opportunities/reviews are set yet.

DEVELOPMENT: Another change for 9201 Delridge Way SW

Another change in plan for the ex-auto-shop site at 9201 Delridge Way SW. Originally it was planned for redevelopment as a self-storage facility; then the plan changed to a mixed-use building. Now, city records show it’s changed again – a new developer, new architect, and new plan. The developer is now an LLC with the same ownership as STS Construction Services (WSB sponsor), whose headquarters and other recent projects are nearby; online records show the site was sold for $2.1 million in March. The new architect is Atelier Drome. The previous plan, which was about to go to the Southwest Design Review Board before public meetings were suspended in March, included 46 apartments and 3 live-work units The new early-stage site plan proposes ~67 residential units. As for public comment, the process has changed because of the pandemic but we’re continuing to watch city files.

DEVELOPMENT: West Seattle Junction mixed-use project gets land-use OK, but will it be built?

(Rendering from November 2019 Design Review packet, by Caron Architecture)

Today’s city-circulated Land Use Information Bulletin includes word of a final land-use approval for 4508 California SW, a mixed-use project described as “a 7-story building with 38 apartment units, 20 small efficiency dwelling units, lodging and retail,” with 14 offstreet parking spaces. Much has changed since we covered the project’s final Design Review meeting six months ago – a pandemic and a closed, possibly unfixable bridge. So before publishing word of the approval (here’s the decision), we called the site’s owner/developer, longtime West Seattle entrepreneur Leon Capelouto, to ask if the project is still on. He noted that “the process” started a relatively long time ago (we first reported on it in March 2018) and they’re certainly going to go ahead and get the permits, but it could be “a long time” before construction. So – provided they survive the COVID-19 economic trouble – the three restaurants in the project’s future space (Lee’s Asian, Kamei, Naked Crepe) won’t be moving any time soon. Meantime, as part of the official process, today’s notice triggers a two-week appeal period (the notice explains how).

DEVELOPMENT: Demolition at 5616 California SW

(WSB photo)

Thanks to Karl for the tip: Demolition is wrapping up at 5616 California SW, on the south side of C & P Coffee (WSB sponsor). We first reported in July 2018 that townhouses were proposed for the site, replacing a nearly century-old house. Recently finalized permit documents show the plan is still for eight townhouses with five off-street parking spaces (none required as the site’s on the RapidRide C Line).

DEVELOPMENT: Comment time for 5051-5053 Fauntleroy Way

From today’s Land Use Information Bulletin, a proposal for seven townhouses on two adjacent Fauntleroy Way parcels has reached the official comment stage. We first reported almost a year ago on the proposal for 5051-5053 Fauntleroy Way SW, which is now listed as two separate projects: four units at 5051, three at 5053, with one offstreet-parking space for each unit. You have two weeks to comment; the notices (here’s the one for 5051; here’s the one for 5053) explain how to do that.

DEVELOPMENT: Another teardown-to-townhouses plan in South Delridge

(King County Assessor’s Office photo)

That mid-1940s house at 9425 18th SW [map] is proposed for demolition and replacement. An early-stage site plan (PDF) has just been filed to build 5 townhouses with 5 offstreet parking spaces. It’s right next door to the Muslim-American Society religious/community-center complex.

DEVELOPMENT: Apartments proposed at 4515 44th SW

Though most construction is on hold, new plans/proposals are still being filed in the city system, so we’ve been keeping watch for anything of note, and found this:

(King County Assessor’s Office photo)

The former CDE Software site at 4515 44th SW [map] has an early-stage proposal for an apartment building: 5 stories, 50 units, no off-street parking, per the site plan (PDF). The site is zoned for development up to 55 feet high (upzoned by HALA Mandatory Housina Affordability, previously 40′). The existing building is to be demolished. The website for CDE, which makes bowling software, shows it now has offices in Tukwila. The Junction site had a redevelopment proposal in 2008, but that was eventually dropped.

DEVELOPMENT: Mixed-use proposal for 9218 18th SW

(King County Assessor’s Office photo)

A new redevelopment proposal in South Delridge for three HALA-upzoned lots centered on 9218 18th SW [map]: It’s described in city files as a 5-story “approximately 76-unit mixed-use apartment building with ground-floor commercial and 1 level of below-grade parking for approximately 36 vehicles.” Though the address is on 18th, part of the site faces Delridge. The early-stage site plan (PDF) is by Caron Architecture.

DEVELOPMENT: 3417 Harbor SW project gets first-phase Southwest Design Review Board approval

(First-stage design packet for project)

The Southwest Design Review Board got its first look tonight at the ~126-unit apartment building proposed for 3417 Harbor Avenue SW.

They decided to approve advancing the project out of the first phase – Early Design Guidance.

Two community members showed up, in addition to four board members (chair Crystal Loya was absent so vice chair Matt Hutchins led the meeting), city planner Crystal Torres, and six members of the project team.

Here’s how the meeting unfolded:

Read More

DEVELOPMENT: Early Design Outreach site tours for Morgan Junction project

Another redevelopment project in the HALA-upzoned area of Morgan Junction has an Early Design Outreach event coming up. This one is for, and at, 6357 41st SW, where five rowhouse-style townhouses with at least 3 parking spaces are planned to replace a century-old house (King Co. Assessor photo above) at 41st/Morgan. The project team, including MAS Architecture, will host two site tours at 4 pm and 5:30 pm next Tuesday (March 10th). The project is in the Streamlined Design Review process, so this is the only public opportunity for Q&A, though written comments will be accepted once the design proposal’s out. The architects have a project webpage set up here.

DEVELOPMENT: See the design packet for mixed-use 9037 35th SW

That’s the design packet (PDF) by JW Architects now posted for the mixed-use project planned at 9037 35th SW [map]. It’s going through Administrative Design Review, so no public meeting, but it is open for public comment.The project is described in the packet as:

The project team is proposing to demolish an existing single family residence, in order
to construct (1) 13,919 sf apartment building with (25) SEDU units and 839.24 sf of commercial space on the ground level. Vehicle Parking provided in on-grade garage, with bike parking provided in centrally located secure bike room.

Height: 55’
Parking: (6) Vehicle Stalls
(25) Bike Stalls – Long Term
(2) Bike Stalls – Short Term

SEDU means Small Efficiency Dwelling Unit, the city’s term for microapartment. Wayne Farrens is the assigned city planner, so if you have feedback, send it to wayne.farrens@seattle.gov. We noted the project’s previous phase of Design Review in June 2018; HALA MHA has upzoned the site from 40′ to 55′ in the meantime.