TRAFFIC, TRANSIT, WEATHER: Monday info

6:00 AM: Good morning! It’s Monday, March 11th.

WEATHER + SUNRISE/SUNSET TIMES

More rain expected, high in the upper 40s. Sunrise will be at 7:29 am, sunset at 7:10 pm.

ROAD-WORK ALERT

Work on the north section of the East Marginal Way project is likely to start this week.

TRANSIT NOTES

Metro today – Regular schedule; check advisories here.

Water Taxi today – Regular schedule. Check the real-time map if you need to see where the boat is.

Washington State Ferries today – The usual 2 boats on the Triangle Route. Check WSF alerts for changes, and use the real-time map to see where your ferry is.

SPOTLIGHT TRAFFIC CAMERAS

Delridge cameras: Besides the one below (Delridge/Orchard), cameras are also at Delridge/Genesee, Delridge/Juneau, Delridge/Henderson, and Delridge/Oregon.

High Bridge – the main camera:

High Bridge – the view from its southwest end (when SDOT points the 35th/Avalon/Fauntleroy camera that way):

Low Bridge:

1st Ave. S. Bridge:

Highway 99: – northbound side at Lander:

MORE TRAFFIC CAMS: All functioning traffic cams citywide are here; West Seattle and vicinity-relevant cameras are on this WSB page.

BRIDGE INFO: The @SDOTBridges feed on X (ex-Twitter) shows whether the city’s movable bridges are opening for vessel traffic.

If you see a problem on the bridges/streets/paths/water, please text or call us (when you can do that safely, and after you’ve reported to authorities if they’re not already on scene). Thank you!

3 Replies to "TRAFFIC, TRANSIT, WEATHER: Monday info"

  • Vee March 11, 2024 (8:00 am)

    Sunset? 7:10

    • WSB March 11, 2024 (8:09 am)

      Fixed, thanks.

  • CarDriver March 11, 2024 (1:39 pm)

    Came through W Marg. about 12:30. Were 3 guys doing some measuring work at the north end bike lane addition. Was no equipment around.

Sorry, comment time is over.