Design Advisory Group for Murray CSO control project

When:
September 27, 2012 @ 6:30 pm – 8:30 pm
2012-09-27T18:30:00-07:00
2012-09-27T20:30:00-07:00
Where:
Fauntleroy Church
9140 California Ave SW
Seattle, WA 98136
USA

The advisory group working on the combined-sewer-overflow-control project for the Murray basin – which feeds the pump station at Lowman Beach – will meet again. The agenda and related documents should appear here before the meeting.

No Replies to "Design Advisory Group for Murray CSO control project"

    Leave a reply

    Your email address will not be published.