In addition to the two Alki Ave projects we’ve been telling you about, we just happened onto rod work that’s got flaggers in action on Beach Drive too, just south of Lowman Beach. Along Alki, the heavy equipment for this week’s paving work was just getting into gear in the 1700 block, and just a few blocks past the end of the paving zone at Bonair, the 53rd SW Pump Project crews have flaggers too – with equipment like this taking up one full lane:
West Seattle, Washington
15 Sunday
| 1 COMMENT