ROAD WORK, TRAFFIC, WEATHER: Monday notes

6:07 AM: Good morning, Today’s forecast includes sunshine and a high temperature that might get into the low 80s.

ROAD WORK

Roxbury repaving – Today and tomorrow, 7 am-4 pm, crews are scheduled to repave Roxbury between 24th and 25th.

Delridge project – Southbound Delridge remains closed between Holden and Trenton. Other closures are ahead, per this week’s update from SDOT.

TRANSIT

Buses are on their regular schedules – except for the Route 120 reroute because of the southbound Delridge Way work and the Route 128 reroute because of the SW Henderson closure east of Delridge. Watch @kcmetrobus for word of bus cancellations.

For ferries, regular schedule. Watch and @wsferries for updates.

BRIDGES AND DETOUR ROUTES

483rd morning without the West Seattle Bridge. Here are the views of other bridges and routes:

Low Bridge: Automated enforcement cameras remain in use; restrictions are in effect 5 am-9 pm daily – except weekends; the bridge is open to all until 8 am Saturday and Sunday mornings. (Access applications are available for some categories of drivers.)

West Marginal Way at Highland Park Way:

Highland Park Way/Holden (note, the light here was flashing red on Sunday night – let us know if that’s still the case Monday morning – 206-293-6302):

The 5-way intersection (Spokane/West Marginal/Delridge/Chelan):

And the 1st Avenue South Bridge (map):

For the South Park Bridge (map), here’s the nearest camera:

Are draw/swing bridges opening for boats or barges? See the @SDOTBridges Twitter feed. (1st Ave. South Bridge openings also are tweeted on @wsdot_traffic.)

See all local traffic cams here; locally relevant cameras are also on this WSB page.

Trouble on the streets/paths/bridges/water? Please let us know – text (but not if you’re driving!) 206-293-6302.

4 Replies to "ROAD WORK, TRAFFIC, WEATHER: Monday notes"

  • sam-c July 19, 2021 (7:46 am)

    Do you know what work is planned all along 26th Ave SW, between Roxbury and Barton?  Much of the street has ‘no parking signs’ (on the east side of the street_, but I wasn’t able to get over there to read the signs / duration.  Surprising that they would schedule more work while the work on Roxbury is right around the corner.  Also adjacent to the Delridge Way / Barton/ Henderson intersection work/ closure.    

    • miws July 19, 2021 (9:30 am)

      Sam-C might relate to Rapid R H? I seem to recall reading about bus stop upgrades that line will serve around Westwood. —Mike

      • sam-c July 20, 2021 (8:24 am)

        MIWS: that makes sense, thanks!

        • miws July 20, 2021 (10:28 am)

          👍

Sorry, comment time is over.