1:14 PM: Per scanner, and thanks to the texter who tipped us, SDOT and SPD will be closing eastbound bridge access from 35th/Fauntleroy shortly to fix another dislocated barrier section, described as being near Walking On Logs.
1:25 PM: Traffic is stopped both ways by the worksite so the barrier can be fixed. Doesn’t sound like it will take too long.
1:34 PM: SDOT says the bridge has reopened both ways.
| Comments Off on TRAFFIC ALERT UPDATE: Bridge open again after barrier work