I’m confused about it as well. When I’d been in touch with them about the project in the beginning, I was told that the entire roadway was going to be paved when they were done, and obviously it wasn’t. I’d be curious to see why they chose to do it this way (time, money, etc.) because I think it looks like crap, and has great potential for potholes to eventually form where the concrete meets the asphalt. If they were going to spend the time and money to do the project, I’m really shocked they didn’t just pave it all.