SDOT has announced the “final design” for the Chief Sealth Walkway Improvements project in Westwood, which you’ll recall was at one point going to be reduced, and then was restored to full size. From SDOT:
This project will improve connectivity, walkability, and safety for residents and students who currently use two unimproved and overgrown paths on 25th and 26th avenues SW, between SW Trenton and SW Cloverdale streets.
Project elements include:
• Two 10-foot-wide asphalt walkways on 25th and 26th avenues SW connecting SW Trenton St and the cul-de-sacs to the north
• Pedestrian lights along the two paths
• Removal of overgrown vegetation and installation of new trees and plants, where appropriate
This document has backstory from the original community proposal. Construction could start as soon as mid-May, says SDOT, which also says the final design is available for another NSF project, Harbor/Spokane, but as of right now still has not updated that project website to show it. Also, both projects will be handled by the same contractor, and SDOT says the bid/award process isn’t complete yet.