November 2, 2013 at 6:49 pm
#799219
wakeflood
Participant
I’ll concede that point, to a degree, but since both systems have been scaled back in our history, and witness the multiple scaling back scenarios currently in-progress with the east side Light Rail section, I’m not sure how much easier it is.