I have never thought that the city having to pick the lowest bidder for construction projects is a good idea.
There were issues from the beginning.
Several concrete panels on the roadway had to be replaced.
There were issues with water drainage.
And, there are deep tire tracks in the concrete where someone drove on it before it was cured.