WSB Forum » Open Discussion

(2 posts)

Work Occuring at 35th and Avalon Building


  1. Mike D.
    Member Profile

    Noticed today that the east wall of the Mastro property at 35th & Avalon was being prepped for siding. I am relieved to see that either the bank or whomever is responsible for the building during the legal wrangling is seeing to it that the building's shell is protected from the winter rains.

    Posted 2 years ago #         
  2. excellent

    Posted 2 years ago #         

RSS feed for this topic

Reply

You must log in to post.

All contents copyright 2012, A Drink of Water and a Story Interactive. Here's how to contact us.
No photo reuse without permission.
Entries and comments feeds. ^Top^